Cloud Migration

Cloud Strategy & Consulting

Move to the cloud without the downtime

We move your applications, databases, and files to AWS, Azure, or Google Cloud with a rehearsed cutover, tested rollbacks, and your users barely noticing.

Get a quote Talk to an engineer

AWSMicrosoft AzureGoogle CloudMicrosoft 365AWSMicrosoft AzureGoogle CloudMicrosoft 365

Engagement models

How we work with you

Cloud work is scoped, not sold off a shelf. Pick the shape that fits, and we quote it properly — in writing, within 24 hours, with no obligation.

Assess

You want to know what moving will cost, how long it will take, and what could go wrong — before committing.

  • Full workload and dependency inventory
  • Migration wave plan and TCO estimate
  • Downtime and risk assessment
  • Pilot migration of one low-risk system
  • Written go / no-go recommendation

Scoped quote in 24 hours

Get a quote

Manage

You want us to keep running the new environment after the move, 24/7.

  • Everything in Migrate, plus:
  • Managed CloudOps from day one
  • Monthly cost and performance reviews
  • Patching, backups, and monitoring included
  • Quarterly optimisation and roadmap

Scoped quote in 24 hours

Get a quote

Overview

Migration is a project, not a weekend

A cloud migration done well looks boring from the outside: systems move one wave at a time, each one tested before the next starts, and the cutover happens in a planned window with a rehearsed rollback. A migration done badly looks exciting — and nobody wants excitement at 2 a.m. with the website down.

We start with a full inventory: every server, database, file share, scheduled job, and the forgotten cron that nobody owns. Then we sequence the move by dependency and risk, rehearse the cutover on a copy, and only then move production. After the move we stay for 30 days of hypercare, watching the new environment under real load.

At a glance

  • Rehost, replatform, or refactor — chosen per workload
  • Rehearsed cutovers with tested rollback plans
  • Database migration with replication, not big-bang dumps
  • Zero or near-zero downtime for most workloads
  • Cost baseline set before the move, so savings are real
  • 30-day hypercare included on every migration

Who it is for

Built for teams who run on it

Businesses leaving on-premises

Your server room is ageing, the hardware is out of warranty, and the next failure is a matter of when. We move you out on a plan.

Teams escaping a bad host

Slow support, surprise bills, or a host that cannot scale. We move you to a platform you control.

SaaS and product teams

You need to scale, deploy faster, and stop babysitting servers so your engineers can build product.

Mergers and consolidations

Two estates, one platform. We rationalise duplicated systems and move what survives, cleanly.

Compare

Migration approaches, compared

Rehost (lift & shift)ReplatformRefactor
What changesAlmost nothing — same apps, new homeSmall changes: managed database, containersSignificant rewrite for cloud-native design
SpeedFastest — weeksModerate — weeks to monthsSlowest — months
Cost benefitLow at first, grows with optimisationGood — managed services cut ops costHighest long term, highest upfront cost
RiskLowestMediumHighest — needs strong testing
Best whenHardware is dying and time is shortYou want managed services without a rewriteThe application is core to the business

What you get

Everything included, nothing assumed

Dependency mapping

We find every hidden dependency — the cron jobs, the file shares, the API nobody documented — before anything moves.

Database replication

Databases move by replication with a final sync, not by a weekend dump-and-pray. Your data arrives intact and current.

Rehearsed cutover

Every cutover is rehearsed on a staging copy first, with a rollback plan that has actually been tested.

Network and DNS

VPCs, subnets, security groups, DNS, and SSL are rebuilt properly in the new environment — not copied blindly.

Cost baseline

We record what the old setup cost and what the new one should cost, so the migration’s value is measured, not assumed.

Hypercare

Thirty days of close monitoring after cutover, with a named engineer and a daily check-in until the new home is proven.

How it works

From first call to running in four steps

  1. Assess

    We inventory every workload, map dependencies, and build the wave plan with a TCO estimate.

  2. Pilot

    One low-risk system moves first, end to end, to prove the method and the tooling.

  3. Migrate

    Workloads move wave by wave, each tested before the next starts, with rehearsed cutovers.

  4. Optimise

    After hypercare we rightsize, reserve, and tune — turning a lifted estate into a cloud-native one.

Questions

Asked often, answered plainly

A small estate of a few servers can move in two to four weeks. A larger estate with databases and dependencies typically takes six to twelve weeks. The assessment gives you a real date, not a guess.

For most workloads, minutes — a planned cutover window, usually out of hours. Some systems can move with no downtime at all using replication. We agree the window with you in advance.

Every cutover has a tested rollback plan. If the new environment does not pass its checks, we roll back to the old one and try again in the next window. Your data is never at risk.

Not for a rehost. If we replatform or refactor, we agree the changes with you first and test them in staging before they touch production.

Thirty days of hypercare, then you choose: we hand over to your team with full documentation, or we keep running it under Managed CloudOps.

Keep exploring

Related services

Not sure what your cloud needs? Ask an engineer.

Talk to a real engineer, not a ticket queue. Tell us what you run today and what is hurting, and we will tell you honestly whether we can help — and what it will take.

Chat on WhatsApp Contact us

We reply in minutes, 24/7.